Fears outdoor gym plan could be revived
BBCPark volunteers fear a previously scrapped outdoor gym could be revived after council communication said the "idea is still there".
The scheme, for the former Elvet bowling green near Durham city centre, was dropped last year amid outrage from residents and "inconclusive" results from a consultation.
But an internal Durham County Council review, carried out at the request of the Elvet Green Durham group, said the proposal remained "at a very early stage of development", while a response to the local MP's office said the idea "is still there and might be rejuvenated at a later date".
The local authority said there were no plans for an outdoor gym at the park.
Simpa Carter, from Elvet Green Durham (formerly Hemp Garden Community Association) said finding out the plan could be revived had been "distressing".
He said he worried the park could be used as a storage while works on nearby Baths Bridge take place to then make way for the gym equipment.
The Reform UK-led council said the site would not be needed as part of the bridge project.
Steve LindsayElvet Green Durham, which has cared for the former Durham bowling green since 2017, requested the internal review after fencing and no entry signs briefly went up at the park at the end of August.
The review, seen by the BBC, said the Corporate Property and Land service "advised that the outdoor gym proposal and future use of the site remain at a very early stage of development".
Another council response to a separate query by Labour City of Durham MP Mary Kelly Foy over the Baths Bridge construction works, also seen by the BBC, said: "The idea to install gym equipment is still there and might be rejuvenated at a later date."
The gym proposals included a range of equipment, but residents said the facility was not wanted and a consultation event in July 2025 was branded a "farce" and "show and tell".
Carter called on the council to "stop wasting public funds fighting what the public wants" and communicate with the community over the park's future.
"There is so little publicly owned freely accessible green spaces left in Durham city," he said.
"The nature and the biodiversity that has been massively improved on site by our ongoing and sustained efforts needs to be protected and we need to have assurances that the park will not be destroyed on a whim for storage equipment when there are other far more suitable sites available."
The council's interim head of corporate buildings Kevin Lough said there were no plans for an outdoor gym at the site.
"The former bowling green area remains open to the public until further notice, and will not be required as part of the Baths Bridge project," he added.
Follow BBC North East on X, Facebook, Nextdoor and Instagram and listen on BBC Sounds.
